Entries by admin

CCLEX main bridge span now connected

A major construction milestone was reached by the Cebu-Cordova Link Expressway (CCLEX) project, when the final main bridge has been cast in concrete, concluding a complex project covering more than three years of non-stop construction, even rising above unprecedented challenges brought mainly by a pandemic.

CALAX gearing up to be a Green Highway

The Cavite-Laguna Expressway (CALAX), project of MPCALA Holdings Inc. (MHI), a subsidiary of Metro Pacific Tollways Corporation (MPTC), the infrastructure arm of the Metro Pacific Investment Corporation (MPIC), plans to showcase MPTC’s role in decarbonizing the transport sector in the country.

CALAX SILANG EAST INTERCHANGE NOW OPEN

The Department of Public Works and Highways (DPWH) with MPCALA Holdings Inc. (MHI) inaugurated the fourth section of the 45-kilometer Cavite-Laguna Expressway (CALAX) with the opening of the CALAX Silang East Interchange Section, extending the operating sections from 10 kms to 14.24 kms.